Monolithic Slab Concrete Calculator
Enter outside slab dimensions and the edge depth from your plans.
Quick answer: total concrete = slab L × W × T + edge cross-section × edge centerline length + interior beams, ÷ 27 for yd³. A 24 × 24 ft garage slab 4 in thick with a 12 × 12 in turndown is 192 + 61.3 = 253.3 ft³ = 9.38 yd³, or about 10.3 yd³ with 10% waste.
Built for monolithic slabs where the footing and floor are poured together: the field slab, a thickened perimeter edge (square or with a sloped inner face), and optional interior thickened beams under bearing walls or posts, with bags, trucks and cost.
Enter outside slab dimensions and the edge depth from your plans.
Treat the pour as three solids: a flat slab across the full outside footprint, a ring of extra concrete hanging below the slab around the perimeter, and any interior strips. Counting the edge only below the slab bottom avoids paying twice for the top 4 inches, and measuring it along its centerline keeps the four corners from being counted twice.
A detached garage slab is 24 × 24 ft, 4 in thick, with a 12 in wide turndown 12 in deep from the top of the slab. There are no interior beams.
The turndown alone is 2.27 yd³ — almost a third more concrete than the 7.11 yd³ flat slab. If the same edge had a sloped inner face widening to 24 in at the slab, the section grows to 1.0 ft² and the edge to 89.8 ft³, adding about another 1.05 yd³.
Concrete below a 4 in slab only, for a straight run (corners ignored), before waste. Add these to the flat-slab volume.
| Edge (bottom width × total depth) | Depth below slab | ft³ per 10 ft | yd³ per 10 ft | yd³ per 100 ft |
|---|---|---|---|---|
| 12 in × 12 in | 8 in | 6.67 | 0.25 | 2.47 |
| 16 in × 12 in | 8 in | 8.89 | 0.33 | 3.29 |
| 12 in × 16 in | 12 in | 10.00 | 0.37 | 3.70 |
| 12 in bottom, 24 in top (sloped) × 12 in | 8 in | 10.00 | 0.37 | 3.70 |
| 16 in × 18 in | 14 in | 15.56 | 0.58 | 5.76 |
A thickened edge slab, also called a monolithic or turned-down slab, is a floor slab and its perimeter footing poured in one piece. The slab is typically 4 inches thick and the edge drops to a deeper, wider section that carries the wall loads. It is common for garages, sheds and slab-on-grade houses in mild climates.
A 12 in wide by 12 in deep turndown, measured from the top of the slab, is common for sheds and detached garages. Houses and colder climates often need deeper or wider edges, or a frost-protected design, to reach the required bearing and frost protection. Your plans and local code set the actual size.
A 24 ft × 24 ft slab at 4 inches is 192 cubic feet. A 12 in × 12 in turndown adds 61.3 cubic feet (8 in below the slab along a 92 ft centerline), for 253.3 cubic feet or 9.38 cubic yards. With 10% waste, order about 10.3 cubic yards.
Yes, if the bottom width stays the same. On a 24 × 24 ft slab, widening the top of a 12 in turndown to 24 in with a sloped inner face raises the edge volume from 61.3 to 89.8 cubic feet, about 1.05 cubic yards more before waste.
An 8 × 10 ft shed slab at 4 inches with a 12 in × 12 in turndown needs 48 cubic feet of concrete, or 52.8 cubic feet with 10% waste. At about 0.60 cubic feet per 80 lb bag that is roughly 88 bags, so many builders order a short load of ready-mix instead.