Ready Mix Order Planner
Patio preset — 4 in thick · 10% waste · 10 yd truck typical
Estimate ready mix concrete quantity, truck loads, delivery requirements, and project concrete costs using accurate contractor-grade ready mix formulas.
Cubic yards = length × width × depth (ft) ÷ 27, plus waste. Trucks = yards ÷ truck size, rounded up. Cost = yards × price per yard + delivery fee.
Example: 24 × 24 ft slab at 6 in = 10.67 cu yd, 11.7 with 10% waste: that is two 10-yard trucks.
10-yard truck: it carries up to 10 cu yd (route weight limits can lower that, so confirm with your plant). Cost = cu yd × your plant's price per yard, plus delivery. A 10 cu yd pour with the default 10% waste becomes 11 cu yd: two 10-yard trucks, and the second is a 1-yard short load that may carry a short-load fee.
Patio preset — 4 in thick · 10% waste · 10 yd truck typical
Eight-, ten-, and twelve-yard drums are common. Weight limits on route may reduce what you actually receive per ticket.
Book the first truck for start-of-pour. Stagger loads so finishers keep pace—cold joints form when idle time exceeds mix set.
Match truck spacing to crew size. A second load sitting on the road while the first is still being screeded wastes time and money.
Order quantity with waste beats a short load. One extra yard is cheaper than a emergency short-load fee on a Saturday.
| Truck Size | Best For | Planning Note |
|---|---|---|
| 8 yd | Tight sites, residential | More loads on large pours |
| 10 yd | Most residential slabs | Common default for estimates |
| 12 yd | Commercial flatwork | Confirm bridge and axle limits |
4 in thick, 10% waste.
6 in thick, double-car bay.
20×40 ft, 5 in thick.
50×80 ft, 6 in thick.
This ready mix concrete yard calculator pairs with the concrete yard calculator for pure yardage and the concrete volume calculator for CF and m³. For slab-type presets with bags, see the concrete slab calculator.
Concrete cost is cubic yards times your price per yard. Total project cost adds the delivery fee you enter—labor, pump, and finishing are separate.
Dispatch schedules whole trucks. A 10.1-yard pour on a 10-yard drum still needs two tickets for planning and crew pacing.
No. Enter delivery fee manually if your plant quotes a flat per-load charge. Short-load surcharges vary by supplier.
How we built this calculator: results use the standard volume, area, and coverage formulas shown on this page, with typical U.S. material densities, bag yields, and waste factors that you can override. Written and checked by the YardsCalculator editorial team. Last reviewed: October 2026.