Quick answer: base gravel (tons) = area × base depth (ft) ÷ 27 × 1.2 for compaction × 1.4 tons/yd³. A 12 × 16 ft patio with a 4 in base needs 2.84 yd³, about 3.98 tons of base, plus 0.65 yd³ of bedding sand for a 1 in layer and 56 ft of edging.
Everything that goes under and between the pavers: compacted gravel base, screeded bedding sand, polymeric joint sand, and edge restraint. To count the pavers themselves, use the paver calculator.
Enter the paved area and pick the project type.
A paver installation is three layers. A compacted crushed-stone base carries the load and drains water; a thin, screeded layer of coarse sand gives the pavers a smooth bed; and joint sand locks the pavers together. Each layer is area × depth, but the base must be bought loose and compacted down, so it gets a compaction allowance.
An 8 in base on clay soil, 1 in bedding sand, and one 20 ft side against the garage slab:
Base with a 20% compaction allowance at 1.4 tons/yd³. Every row also needs about 0.34 yd³ (0.46 tons, or 19 half-cubic-foot bags) of bedding sand for a 1 in layer with 10% extra. Dig depth assumes 2-3/8 in (60 mm) pavers.
| Project | Base depth | Base yd³ per 100 ft² | Base tons per 100 ft² | Total dig depth |
|---|---|---|---|---|
| Walkway or patio | 4 in | 1.48 | 2.07 | 7-3/8 in |
| Patio on clay, cold climate | 6 in | 2.22 | 3.11 | 9-3/8 in |
| Driveway, firm soil | 6 in | 2.22 | 3.11 | 9-3/8 in* |
| Driveway, clay or frost areas | 8 in | 2.96 | 4.15 | 11-3/8 in* |
* Driveways often use 3-1/8 in (80 mm) pavers; add 3/4 in to the dig depth if you use them.
Base: use a dense-graded crushed stone with fines — sold as paver base, 3/4 in minus, crusher run, or road base. It compacts into a firm layer. Clean, round gravel and pea gravel do not lock together and should not be used under pavers. Place the base in 2–4 in lifts and run a plate compactor over each lift. Bedding sand: industry guidance calls for coarse, washed concrete sand (ASTM C33), screeded to a uniform 1 in. Avoid stone dust and fine mason or play sand, which hold water and can cause the pavers to shift. Joint sand: polymeric sand is swept into dry joints after the pavers are compacted, then misted to activate its binder; coverage depends heavily on paver size and joint width, so trust the product label over any rule of thumb.
For the same base under a gravel or crushed-stone surface instead of pavers, see the crusher run calculator.
Multiply the patio area by the compacted base depth in feet, add about 20% for compaction, and divide by 27 for cubic yards. A 12 × 16 ft patio with a 4 inch base needs about 2.84 cubic yards, or roughly 4 tons at 1.4 tons per yard.
A 4 inch compacted gravel base is the usual minimum for walkways and patios on well-drained soil. Use about 6 inches for patios on clay or in cold climates and 6 to 8 inches for driveways. Add 1 inch of bedding sand and the paver thickness to find the total dig depth.
Pavers sit on a screeded 1 inch layer of coarse bedding sand. That is about 0.31 cubic yards per 100 square feet, or 0.34 yards with 10% extra — roughly 19 half-cubic-foot bags. A 400 square foot patio needs about 1.36 cubic yards with the allowance.
Divide the paver area by the coverage printed on the bag. A 50 lb bag commonly covers somewhere between about 35 and 100 square feet depending on paver size, joint width, and paver depth, so the range is wide. At 50 square feet per bag, a 192 square foot patio needs 4 bags.
Not for a durable installation. Sand alone does not carry loads or drain like compacted crushed stone, so pavers set on sand only tend to settle and rut. Sand is just the 1 inch bedding layer on top of a compacted gravel base.
How we built this calculator: results use the standard volume, area, and coverage formulas shown on this page, with typical U.S. material densities, bag yields, and waste factors that you can override. Written and checked by the YardsCalculator editorial team. Last reviewed: October 2026.